Sign In | Join Free | My hardware-wholesale.com |
|
Brand Name : YDX
Model Number : YDX123
Certification : ISO,BV.SGS,CE
Place of Origin : CHINA
MOQ : 1TON
Price : USD760/TON
Payment Terms : L/C,T/T,Western Union,MoneyGram
Supply Ability : 10000TON/MONTH
Delivery Time : 35 DAYS
Packaging Details : Steel pallet
Steel Grade : Q235B Q345b Low Carbon Steel
Main Structure : Hot Rolled or Welded H Section, I Section
Connect : All Bolt Connection(High-Strength and Normal Bolt)
Roof/wall material : Single Sheet or Sandwich Panel
Usage : Steel Structure Platform, Steel Workshop, Structural Roofing, Steel Walkway and Floor, Steel Fabricated House, Frame Part, Steel Structure Bridge
Door : Walk Door, Sliding Door, Roller Door
Pre engineering building material steel structure warehouse
1. Free to design architectural drawings for you;
2. Features: Fast and flexible to assemble, safe, thermal and noise insulation, water proof and fire prevention;
3. Cost-effective: Fast and easy installation greatly shorten the construction time which reduce the costs;
4. Durability: The whole structure is easy in maintenance, which can be used for more than 50 years.
5. Perfect design: Perfect design completely avoids leaks and water seepage. Meanwhile, it's also in line with the national level of fire prevention.
6. Carrying capacity: can resists the impact of strong wind and seismic performance and bears heavy snow loads
Steel structure Design Low Carbon Food Plant Steel Structure warehouse
Base | Cement and steel foundation bolt |
Main frame | H beam |
Material | Q235B, Q345B or others as buyers' requests |
Purlin | C or Z purlin: Size from C120~C320, Z100~Z20 |
Bracing | X-type or other type bracing made from angle, round pipe |
Bolt | Plain bolt and High-strength bolt |
Roof & wall | Sandwich panel or color plate |
Door | Sliding or rolling door |
Window | Aluminium alloy window |
Surface | Two times of Anti-rust Painting or Hot Dip Galvanized |
Sheet | 0.5mm or 0.6mm galvanized sheet |
Accessories | Semi-transparent skylight belts, Ventilators,down pipe, galvanized gutter, etc |
After the laying is completed, find the rules for the anchor bolts. Strictly position according to the axis and elevation provided.
Find the rules: It is required that all anchor bolts are aligned and the steel columns are placed in a straight line.
When hoisting steel columns, the foundation nuts should be leveled in advance. During hoisting, no one is allowed to stand within the lifting range of the crane. After the steel columns are basically in place, people should install them. The anchor nut should be tightened.
Lifting of steel beams after assembly: After the construction of steel column tie rods/column supports is completed, the steel beams will be lifted
Tie rod connection between steel beams: must achieve bolt tightening and consistent direction
The roof steel beams use high-strength bolts and do not require welding.
Platform beams are divided into main beams and secondary beams: the main beams are generally welded, and the wing plates are welded. Secondary beams are generally not welded.
Roof inner panel completed
Finished photo
![]() |
H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction Images |